In this second of four episodes, Paul and the homeowners tackle the extensive lighting plan. While the studs are still exposed, the lighting fixtures are installed and wired. An unexpected mold problem is discovered in the back wall and they go over the steps to combat the moisture problem.
Enjoy a short Video Preview of the kitchen's before-and-after design.
Don't miss your favorite shows in real time online.
Keep up with your favorite shows and hosts plus share ideas with other DIY fans.
Ttop tech meets sophisticated Texas style
A lodge-style retreat in Whitefish, Montana
An amazing renovation in Cincinnati, Ohio