The first step in adding a redwood deck to an older house is to break up the existing concrete porch, followed by setting the new support posts.
With the support posts anchored in dried concrete, the next step in the project is constructing the deck perimeter.
Having established the deck perimeter, the floor joists are finished and the redwood decking is attached.
With the deck floor complete, build custom railings. The decks support posts serve as mounts for the new railing system.
The deck is completed with construction of a flower box and applying a fresh coat of deck stain.
Advertisement
Mailbox Repair (01:43)
Tile Insert (00:60)
Basics on Deep Cleaning a Bath (01:00)
Cleaning with Vodka (04:18)
Bathroom Technology (00:60)
Refrigerator Cleaning Tips (01:00)
Showerhead Upgrade (00:60)
Concrete Repairs (02:47)
Tub Upgrade (00:60)
Cool Countertops (00:60)
Kitchen Design Don'ts 5 Photos
Awesome Rooms From Man Caves 18 Photos
Lighting Tips and Tricks 6 Photos
Savvy Sinks and Faucets 7 Photos
How to Choose a Color Scheme: 8 Tips to Get Started 4 Photos
How to Add Outlets 8 Photos
Comparison shop at Shopzilla & Bizrate.
© 2009 Scripps Networks, LLC. All Rights Reserved