The first step in adding a redwood deck to an older house is to break up the existing concrete porch, followed by setting the new support posts.
With the support posts anchored in dried concrete, the next step in the project is constructing the deck perimeter.
Having established the deck perimeter, the floor joists are finished and the redwood decking is attached.
With the deck floor complete, build custom railings. The decks support posts serve as mounts for the new railing system.
The deck is completed with construction of a flower box and applying a fresh coat of deck stain.
Advertisement
Kitchen Flooring Options (01:51)
Add-a-Bath (03:00)
Wine Rack (01:00)
New Floating Kitchen Floor (04:54)
Garage Mahal: Guy Fieri Promo (00:15)
Assembling Cabinets (00:60)
Garage Mahal Guy Fieri sizzle (02:00)
Mirror Update (00:60)
Tool Hunter (03:11)
Custom Bookshelf (01:00)
Adding Texture to Walls 3 Photos
BATHtastic! Behind the Scenes 16 Photos
8 Steps to the Perfect Bathroom 8 Photos
TOP 10 JUST BAKED KITCHEN COLORS 10 Photos
Top 10 Roofing Tips 10 Photos
How to Choose a Color Scheme: 8 Tips to Get Started 4 Photos
Awesome Rooms From Man Caves 18 Photos
Comparison shop at Shopzilla & Bizrate.
© 2009 Scripps Networks, LLC. All Rights Reserved