DIY Network

Time Square Billboards

Episode DPEX-105

Jason Cameron helps crews install a massive HD flatscreen in Times Square. The screen is so massive that Times Square needed to run more power into the building and reinforce the street to keep the installation crane from collapsing the subway below. Working furiously through the night before reopening Broadway for morning traffic, Jason drills holes through the building to set the brackets as crews use a surveyor to make sure the 2500-square-foot monstrosity is level.

Advertisement

Shows You’ll Like