DIY Network

How to Install a Hardwood Floor (page 1 of 2)

DIY experts give steps on how to install hardwood floors in any room.

More in Floors

use cut off boards from one row to start next row Watch Video

Step 1: Choose the Boards

Choose the hardwood species and board widths for the room installation.

Step 2: Measure the Room

Measure the width and length of the room and multiply for the square footage. When ordering hardwood flooring, allow 10-15 percent extra for irregular boards and any cutting mistake.

Step 3: Check for a Squeaky Floor

Check the sub-floor. Minimum requirements are a 3/4" plywood sub-floor. Make sure there are no squeaks in the floor. If there's a squeak, screw a long drywall screw into the sub-floor and joist where the squeak occurs. Remove shoe-molding from the room and sweep and clean thoroughly.

Step 4: Roll Out the Vapor Barrier Paper

Roll out strips of vapor barrier paper, allowing at least a 4" overlap and staple securely to the sub-floor. Use 15 pound tar paper or felt. It is relatively inexpensive (it's approximately $12 a roll at a home improvement store). Mark with a pencil along the baseboards where the joists are located.

Step 5: Start Installation

Start the installation at the longest unobstructed wall. Remove the shoe molding, and snap a chalk line 3/8" out from the baseboard (this allows for expansion in the hot, humid weather and contraction in the colder, drier weather of the hardwood flooring).

Step 6: Place the Boards

Begin by selecting a long board to start the first row. Pick one that is straight. Align the edge of the board with the chalk line and drill pilot holes down through the hardwood plank and into the sub-floor and joist. Face-nail each board at the point of every joist and set the nail with a nail-set. Face-nail the entire first row and remember to keep the board lengths random. It is important to face-nail the first row because the pneumatic nail can't get down in there. It will hit the wall and the force would push the wood against the baseboard, which would lose the 3/8" expansion and contraction.

It is important to lay the first boards perpendicular to the joists which are underneath. That is important because you want a nice solid anchor. Look at the subfloor to see which way the nails and seams ran. Try to go underneath the crawl space to see how they run.

face nail each board at joist and then set nail

Step 7: Hand-Nail the Rolls

After the first few rows have been installed, drill pilot holes down into the tongue of each board and hand-nail the rolls until there is enough clearance for the pneumatic nail gun.

Tip: Lay out a box of hardwood boards ahead of the installation to visualize lengths, wood grain and colors of the boards. When laying out the boards, keep in mind to never have the ends of boards in adjacent rows line up with each other. Keep the lengths random and at least 6" in length.

Step 8: Staple the Boards

Using the pneumatic nail gun, place the gun lip over the edge of the board and strike firmly with the mallet, driving the staple into the tongue of the hardwood plank.

When installing up to a threshold, it is not critical to make cuts exact. Come back later after the floor has been installed and use a circular saw to cut across for a precise cut.

« Previous12Next »

Advertisement

Projects

Resources

  • Brazilian teak pre-finished hardwood flooring and HuskyCoat hardwood flooring from Lumber Liquidators Inc.

COMMENT ON THIS PROJECT

    

Sign in

All fields are required.

E-mail Address:

Password:

Remember me on this computer

Signing in

Please enter your email address and we will send your password

E-mail Address

Your password has been sent and should arrive in your mailbox very soon.

Not a member?

Sign up with DIY Network to share tips with other do-it-yourselfers and comment and ask questions on projects.

It's free and easy.