        How To Build a Retaining Wall for a Campsite

        Learn how to use composite timbers to construct the retaining wall.
        • Time

          Weekend

        • Price Range

          $1,000 - $2,500

        • Difficulty

          Moderate to Hard

        In this Project you will:

        Step 1: Dig the Trench

        Because composite timbers are made from recycled materials, such a plastic bags, they won't decompose, making them ideal for projects involving ground contact. Dig the trench from the lowest point of the wall; this gives an idea of how deep the trench needs to be dug in order to keep the area level. When building a retaining wall, it is crucial that the first layer of the foundation be level, since the remaining wall will be built on top of the base course.

        Step 2: Begin Laying Timbers

        Lay the first timber in place and check for level (Image 1). If necessary, use a mallet to "stamp" the timber into the trench, getting rid of any small rocks that might cause the level to be wrong. Repeat the process until the first course of timbers is in place. When the first course is level, a framing square is used to match corner pieces, then timber spikes are used to secure the pieces together (Image 2). An easy trick to remember for hammering timber spikes is to hammer them at an angle, which is easier to do due to the more natural arm motion of swinging up and back, rather than straight up and down (Image 3).

        Step 3: Insert the Rebar

        Next, further secure the timbers by drilling three holes, one close to each end of the timbers and one in the middle, and use a sledgehammer to drive 2' sections of rebar through the holes into the ground. Secure all first-course timbers with rebar, checking for level as each piece is secured.

        Step 4: Add the Second Course

        When the first course is secure, begin adding the second course, making sure the joints of the second course don't line up with the first course. Overlapping the joints increases the stability of the structure. For shorter timbers, trim the edges with a saw. Secure each layer with timber spikes.

        Step 5: Move the Dirt

        As the wall grows, dirt taken from the trench is poured in around the outside perimeter and tamped down to fill in air pockets and prevent further shifting of the soil. With the wall in place, a compact utility loader is used to move dirt from higher sections of the yard into place behind the wall. Utility loaders, which also have backhoe, auger and bucket attachments, are available at rental centers and are a great time-saver when moving dirt, rocks, etc.

        Was this project helpful?

        Don't forget: Read comments and leave your own

        Advertisement

        Resources

        • Tools from Black and Decker
        • Tools from Delta Tools
        • Tools from Porter-Cable Corporation

        COMMENT ON THIS PROJECT

            

        Sign in

        All fields are required.

        E-mail Address:

        Password:

        Signing in

        Please enter your email address and we will send your password

        E-mail Address

        Your password has been sent and should arrive in your mailbox very soon.

        Not a member?

        Sign up with DIY network to share tips with other do-it-yourselfers and comment and ask questions on projects.

        It's free and easy.