DIY Network

How To Build a Retaining Wall for a Campsite

Learn how to use composite timbers to construct the retaining wall.

More in Outdoors

construct retaining wall
  • Time

    Weekend

  • Price Range

    $1,000 - $2,500

  • Difficulty

    Moderate to Hard

Highlights:

Step 1: Dig the Trench

Because composite timbers are made from recycled materials, such a plastic bags, they won't decompose, making them ideal for projects involving ground contact. Dig the trench from the lowest point of the wall; this gives an idea of how deep the trench needs to be dug in order to keep the area level. When building a retaining wall, it is crucial that the first layer of the foundation be level, since the remaining wall will be built on top of the base course.

first layer of foundation must be level

Step 2: Begin Laying Timbers

Lay the first timber in place and check for level (Image 1). If necessary, use a mallet to "stamp" the timber into the trench, getting rid of any small rocks that might cause the level to be wrong. Repeat the process until the first course of timbers is in place. When the first course is level, a framing square is used to match corner pieces, then timber spikes are used to secure the pieces together (Image 2). An easy trick to remember for hammering timber spikes is to hammer them at an angle, which is easier to do due to the more natural arm motion of swinging up and back, rather than straight up and down (Image 3).

Step 3: Insert the Rebar

Next, further secure the timbers by drilling three holes, one close to each end of the timbers and one in the middle, and use a sledgehammer to drive 2' sections of rebar through the holes into the ground. Secure all first-course timbers with rebar, checking for level as each piece is secured.

Step 4: Add the Second Course

When the first course is secure, begin adding the second course, making sure the joints of the second course don't line up with the first course. Overlapping the joints increases the stability of the structure. For shorter timbers, trim the edges with a saw. Secure each layer with timber spikes.

Step 5: Move the Dirt

As the wall grows, dirt taken from the trench is poured in around the outside perimeter and tamped down to fill in air pockets and prevent further shifting of the soil. With the wall in place, a compact utility loader is used to move dirt from higher sections of the yard into place behind the wall. Utility loaders, which also have backhoe, auger and bucket attachments, are available at rental centers and are a great time-saver when moving dirt, rocks, etc.

utility loaders are great time savers

Was this project helpful?

Don't forget: Read comments and leave your own

Advertisement

Projects

Resources

  • Tools from Black and Decker
  • Tools from Delta Tools
  • Tools from Porter-Cable Corporation

COMMENT ON THIS PROJECT

    

Sign in

All fields are required.

E-mail Address:

Password:

Remember me on this computer

Signing in

Please enter your email address and we will send your password

E-mail Address

Your password has been sent and should arrive in your mailbox very soon.

Not a member?

Sign up with DIY Network to share tips with other do-it-yourselfers and comment and ask questions on projects.

It's free and easy.