DIY Network

All Projects

TV Projects

    What Do You Want To Work On?

      What Activity Do You Want To Do?

        0

        Available Projects

        Get Results

        Claw Foot Tub Installation: Surround Demolition

        DIY expert Fuad Reveiz replaces an old garden tub with a new look: a claw foot tub.
        • Time

          Day

        • Price Range

          $50 - $100

        • Difficulty

          Easy to Moderate

        In this Project you will:

        Step 1: Remove the Face of the Tub

        Tip: Get a head start on installing a new bathtub by getting your demolition out of the way early.

        Use a hammer and cold chisel to begin removing tile from the face of the tub surround. Take care not to remove any tiles that come in contact with the rim of the tub. Remove tile in this manner until none remains.

        Remove base trim, then remove the cement board. Use a hammer to pry and pull away the cement board, then use hands where possible for faster removal.

        Step 2: Remove the Frame

        Once the entire face of the tub has been removed, it's time to move on to the frame. First, remove one of the 2 x 4 braces to give better access to the drain fitting. Loosen the drain connection to the tub, the use an allen wrench to loosen the screw holding the faucet in place. Remove the faucet.

        In this example, the garden tub has a whirlpool and has a motor and electricity that need to be unplugged.

        Step 3: Raise the Tub Up and Remove Fixtures

        Use a crow bar to raise the tub, then slip a 2 x 4 underneath to raise the tub up and away from the floor (Image 1). This will allow room for you to slide your fingers (with the help of a strong friend) under the tub and lift it right out of the frame (Image 2).

        Remove the remaining tile from the frame, then remove the cement board.

        Remove the remaining 2 x 4 frame.

        Remove the tub handles (Image 3) by loosening them with an Allen wrench.

        Unscrew the escutcheon plates.

        Step 4: Remove the Remaining Tile

        Use a hammer and chisel to remove the tile on the top of the tub frame and carefully work along the back wall. Take care not to disturb any wall tiles.

        Step 5: Remove the Pipes, Etc.

        With all of the tile removed, use a reciprocating saw to cut through the frame (Image 1). Remove cement board and the screws holding the plywood base together. Cut a large section around the plumbing to free the pipes (Image 2).

        Remove the remaining 2 x 4 bracing along the wall, remove the electrical box (after turning off the power) and removing the remaining 2 x 4 framing secured to the floor.

        Was this project helpful?

        Don't forget: Read comments and leave your own

        Advertisement

        COMMENT ON THIS PROJECT

            

        Sign in

        All fields are required.

        E-mail Address:

        Password:

        Signing in

        Please enter your email address and we will send your password

        E-mail Address

        Your password has been sent and should arrive in your mailbox very soon.

        Not a member?

        Sign up with DIY network to share tips with other do-it-yourselfers and comment and ask questions on projects.

        It's free and easy.