A do-it-yourself cabinet remodel can save lots of money on your kitchen remodel.

More in Kitchen

  • Time

    Day

  • Price Range

    $2,500 - $5,000

  • Difficulty

    Moderate to Hard

Step-by-Step Instructions:

Install the Rest of the Upper Cabinets

Once the first cabinet is in place the remaining cabinets can be installed by clamping it to the adjacent cabinet. Secure the cabinet to the wall first and then to its neighboring cabinet (Image 1).

Repeat this process for all of the wall cabinets. If a gap exists between wall and the last cabinet, use a filler bar (supplied by the manufacturer) to enclose the gap. Before securing the last cabinet, measure, mark, cut and secure this piece to the side of the last cabinet.

After all the cabinets are in place, attach the doors and hardware. Remove the ledger board when you are finished installing the wall cabinets.

Measure for the Lower Cabinets

If the floor isn't level, find the highest point in the floor along the wall where the cabinets will be installed. It’s best to try to start the base cabinet installation as close to this high point as possible -- it's easier to shim under the cabinets on the lower spots to make them level with this first one, rather than starting on a low point and having to trim the bottoms of the cabinets while working "uphill".

If the floor is level, start the install on the corner cabinet, it will help you to stay level through the rest of the installation.

Measure base cabinets and use the pencil and level to mark a level line on the wall from the high point in the floor to the cabinet height. Be sure to use a level to assure this line will be true horizontal. This is the guide to be followed for installation.

Use the stud finder to locate and mark the studs along this line around the room.

For the sink cabinet, use shims where necessary to adjust for level. Measure the wall for the plumbing fixtures (Image 1).

Transfer those measurements to the sink cabinet and using a hole saw, cut holes for the plumbing cutting from the inside of the cabinet (Image 2).

Dry fit your first cabinet into place and check for level across the top. If needed, shim until level.

Predrill through the top framing piece into the wall studs and secure the cabinet into place with screws. Re-check level after securing the cabinet.

Repeat this process until all of the base cabinets are installed. Attach the
doors and hardware after all of your cabinets are in place.

Install Remaining Cabinets

Once level, secure the cabinet to the wall by screwing into the studs. Continue installing base cabinets in the same fashion using shims, clamps and securing the cabinets to the studs as well as the adjacent cabinets.

When all the cabinets are in place attach the doors and install drawers and desired hardware.

« Previous12Next »

Was this project helpful?

Don't forget: Read comments and leave your own

Advertisement

COMMENT ON THIS PROJECT

    

Sign in

All fields are required.

E-mail Address:

Password:

Remember me on this computer

Signing in

Please enter your email address and we will send your password

E-mail Address

Your password has been sent and should arrive in your mailbox very soon.

Not a member?

Sign up with DIY Network to share tips with other do-it-yourselfers and comment and ask questions on projects.

It's free and easy.