 |
 |
| AIR TIMES |
April 17, 2008
7:30 PM Eastern |
April 17, 2008
11:30 PM Eastern |
April 23, 2008
8:30 AM Eastern |
May 23, 2008
8:00 PM Eastern |
May 24, 2008
12:00 AM Eastern |
June 14, 2008
7:30 PM Eastern |
June 14, 2008
11:30 PM Eastern |
June 18, 2008
8:30 AM Eastern |
|
|
With only a week left on the project, master carpenter Norm Abram finds general contractor Tom Silva at work on the dramatic three-story stair. With the teak treads and bronze balustrade finally in, Tom can work on installing the teak handrail. Audio/visual specialist Dan Chadwick shows host Kevin O'Connor how he's concealing a 61" plasma TV in the living room, and adding acoustical panels to enhance the sound in the room. Designer Todd Tsiang shows Kevin the modern fireplace mantle, tile, plumbing fixtures, and the fully decorated master suite. In the wet bar, tile contractor Joe Ferrante shows Norm a "bubbly" glass tile being installed on the backsplash.