 |
 |
| AIR TIMES |
April 16, 2008
7:30 PM Eastern |
April 16, 2008
11:30 PM Eastern |
April 22, 2008
8:30 AM Eastern |
May 22, 2008
8:00 PM Eastern |
May 23, 2008
12:00 AM Eastern |
May 31, 2008
7:30 PM Eastern |
May 31, 2008
11:30 PM Eastern |
June 07, 2008
7:30 PM Eastern |
June 07, 2008
11:30 PM Eastern |
June 17, 2008
8:30 AM Eastern |
|
|
In the front guest room, flooring contractor Pat Hunt shows Kevin the new engineered floors from Europe a 5/8" pre-finished red oak floor that carries a 30-year warranty over radiant heat, and locks together without glue. Out front, custom door specialist Tim Forster shows Kevin a cutaway of the construction of the front door as general contractor Tom Silva prepares to hang the door and install the hardware. Landscape contractor Roger Cook sets the massive bluestone treads on a stringer that appears to "float" over the new water feature. Back inside, master carpenter Norm Abram meets plastering contractor Alberto Riponi to see the most challenging trim detail in the house a narrow plaster bead that creates a subtle shadow line around every window and door.