 |
 |
| AIR TIMES |
April 21, 2008
8:00 AM Eastern |
June 15, 2008
7:00 AM Eastern |
June 17, 2008
8:00 AM Eastern |
|
|
Our modular home is assembled, and work continues on the exterior. Bob Vila finds that the roof is getting a lot of attention today, including some new shingles. Around back, cultured stone veneer is applied to the foundation of the home. Inside, Bob looks at the distinct features of the modular construction process, including the marriage walls and joints.