The house is arriving on site today, and we watch as each section of the modular home is lifted off the trucks and positioned by crane. First, each box is unwrapped and prepped, and then lifted into place. The crane operator deftly arranges each box into position. Bob Vila tours the house as it comes together and explain the process of assembling a modular home. The general contractor lets us know what the next steps are once the house is together.