Project time: 3 hours.Materials
Floor-coating materials
Paintbrushes and long-handled roller
Safety glasses
Mask
Bucket
Steps
1. To begin the second step of the flooring, mix the appropriate materials in a large bucket and stir. Make sure to read the directions to find the recommended temperature and humidity for applying this type of product.
2. Paint the edges of the floor first, again working in small sections. After painting a section of the trim, roll out the floor in that area; for even distribution roll out the flooring in an M and a W pattern.
3. Hand-broadcast the decorative flakes over the rolled out flooring while it's still wet (figure A). To distribute the flakes evenly, throw them high in the air, like throwing confetti.
4. Continue working in sections until the floor is covered (figure B).