BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

NEW SHOWS!
Get expert tips and ideas by checking out DIY's Home Improvement Blogs

HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

SPONSOR LINKS

  • Watson Home Theater: How to Frame a Floating Wall
  • Learn how to build a floating wall for this home theater renovation.
    From "Sweat Equity"
    episode DSEQ-108


    PHOTO
    The Watson’s basement already looks bigger and better without the dated wood paneling, and now its time to divide and conquer. Amy helps Ron and Dawn separate the rooms into a home office and a personal custom theater with a floating wall.
    advertisement


    PHOTO

    Figure A
    PHOTO

    Figure B
    PHOTO

    Figure C
    PHOTO

    Figure D
    PHOTO

    Figure E
    PHOTO

    Figure F
    PHOTO

    Figure G
    Materials:

    chalk line
    tape measure
    2" x 4" pieces of lumber
    miter saw
    speed square
    compressor
    nail gun or hammer
    nails
    box level
    mallet
    Ramset (power-actuated nailer)

    Floating Wall Framing Tips:

    • Standard code calls for 16 inches between studs on center.

    • A 2" x 4" piece of lumber is actually 1-1/2" x 3-1/2".

    Safety Alert:


    • Always wear protective eyewear when working with power tools.

    How to Frame a Floating Wall:


    • Amy uses a tape measure to mark the new wall, measuring from the existing wall. Dawn snaps a chalk line along Amy’s marks. (figure A).

    • Then Amy measures from the ceiling to the floor joist above to determine the length of the studs (figure B). Subtract 3 inches from that measurement to account for the top and bottom plates — one 2" x 4" on top and one 2" x 4" on bottom.

    • Amy provides contractor, Adam Berlin the measurements and he and Ron mark the 2" x 4"(s) with a speed square (figure C) and the boards are cut to length.

    • When the boards are cut, Adam and Ron lay out the pieces, one on the top and one on the bottom and a board perpendicular at every 16 inches on center (figure D).

    • Dawn uses a nail gun to secure the boards together. She shoots two nails per board.

    • Everybody helps raise the wall to the chalk line (figure E). Adam uses a mallet to adjust the board to the mark (figure F).

    • Amy checks to make sure that the new wall is plumb and level.

    • Amy shows Dawn how to use the Ramset and she fires a nail into the center of every other stud (figure G) to secure the new floating wall. They finish framing the rest of the basement.


    RESOURCES :

    Handyman Matters
    Website: www.handymanmatters.com


    GUESTS :

    Adam Berlin
    General Contractor
    Maverick Home Remodeling Inc.
    Website: www.RenewTheHome.com

  • RELATED PROJECTS:

  • ALSO IN THIS EPISODE:


  • Gutter Repair
  • Landscaping Basics
  • Flooring
  • UV Air Sanitizer
  • Replacement Windows
  • Planter, Self-Watering
  • Hand-Painted Glasses
  • Choose Washer/Dryer
  • Backsplash Installation
  • Hand-Painted Bowls
  • Prepare for Vacation
  • Maintain Garage Door
  • Disinfect Bathroom
  • Romance Kit
  • Curb Appeal
  • Transport Equipment
  • Installing Undermount
  • Holiday Decorating
  • Family Scrapbook
  • Ice Candle
  • Selecting Doors
  • Spark Plug, Changing
  • Maintain Cabinets
  • Front Door Facelift
  • Change Windowpane