HOME BUILDING Index
Custom Homes
Electrical Systems & Wiring
Garages, Basements & Attics
Heating & Cooling
Home Exterior
Home Interior
Inspections & Codes
Insulation and Energy Efficiency
Plumbing
Rooms
Sewerage & Septic Systems
Site Preparation
Other

BEST OF HOME BUILDING
Best Built Zone
Home IQ
Heck of a Deck
Weekend Projects
Home Renovations
Be Your Own Contractor

SPONSOR LINKS

  • Getting Started: Building Permit
  • From "Blueprint for Home Building"
    episode DBHB-101


    PHOTO

    In this final segment host Jeff Wilson describes what a building permit is and why you need one before you can build a new home.
    You've found the site, picked the house plans and met the team of people who will build your home -- now it's time to find out about the building permit.

    What Is a Building Permit?

    A building permit is the document you receive from your local building department that actually "allows" you to do construction. Once you have a site, a house plan and a builder in place, your builder will then apply for a building permit, which is needed before construction can start.
    advertisement


    PHOTO

    Figure A
    How to Get a Building Permit

    Here are the steps your contractor must go through in order to secure a building permit:

    1. The contractor will talk with local officials to discuss the plans of your house, and the experts will advise him or her of any revisions that need to be made to the plan.

    2. Submit the application (figure A) to local officials for formal review. This review will determine if the proposed house meets with local code. For example, does the plan have adequate infrastructure, fire protection to service the area, etc. This can take as short as a couple of weeks to as long as a couple of months.

    3. The following is needed for a building permit --

      • House plans, including the foundation elevation and framing considerations.

      • Sign-offs from the architect and engineer.

      • Soil reports showing the condition of your site. This is important in rural areas where an additional septic permit may be needed.

      • Approvals and reports from other agencies requested by the permitting office.

    4. Once the application is approved you'll be asked to pay a fee based on the project size, and once payment has been received you're builder can pick up the permit from the local city or county building department.

    5. Once the permit is received it must be hung up a the property site.

    Note: Don't forget to put the cost of your building permit into your construction budget.

    In the next episode of Blueprint for Home Building, host Jeff Wilson covers the excavation process of building your new home.


    GUESTS :

    Greg Allen
    Site Supervisor
    Hendolhurst Homes
    955 Markman Park Rd.
    Baden, PA 15005
    Phone: 724-935-5658
    Fax: 724-935-0884
    E-mail: gcrbs@adelphia.net

    Craig Hill
    President
    Earth Systems Southwest
    79811 Country Club Dr.
    Indio, CA 92203
    E-mail: chill@earthsys.com

    Linda Brettler
    Architect
    Phone: 323-935-3999
    E-mail: lindabrettler@sbcglobal.net

    Carl Cuozzo
    Designer
    Design Basics
    11112 John Galt Blvd.
    Omaha, NE 68157
    Phone: 402-331-9223
    E-mail: ccuozzo@disignbasics.com

    Dave Watson
    Architect
    E-mail: architalk@att.net
    Website: www.watsonarchitect.com

    Dana Bres
    Research Engineer
    US Department of Housing and Urban Development
    451 7th St., SW
    Washington, DC 20910
    Phone: 202-708-4370
    E-mail: dana_b._bres@hud.gov

    Jack Tucker
    Building Wisdom
    Frankford, DE 19945
    Toll-free: 800-844-6275
    E-mail: tucker@buildingwisdom.com
    Website: www.buildingwisdom.com

    Heinrich Klingner
    General Contractor
    Eurocraft Construction
    E-mail: eurocraft1@co8.net

  • ALSO IN THIS EPISODE: