HOME BUILDING Index
Custom Homes
Electrical Systems & Wiring
Audio-Video
Exterior Lighting
Home Security
Interior Lighting
Networking and Technology
Phone

Garages, Basements & Attics
Heating & Cooling
Home Exterior
Home Interior
Inspections & Codes
Insulation and Energy Efficiency
Plumbing
Rooms
Sewerage & Septic Systems
Site Preparation
Other

BEST OF HOME BUILDING
Best Built Zone
Home IQ
Heck of a Deck
Weekend Projects
Home Renovations
Be Your Own Contractor

SPONSOR LINKS

  • Getting Wired: What Is the Rough-In Stage?
  • From "Blueprint for Home Building"
    episode DBHB-113


    PHOTO

    Figure A
    PHOTO

    Figure B
    PHOTO

    Figure C
    Once you've determined your new home's electrical needs and planned ahead of time for the electrical system, it's time for the rough-in stage. Host Jeff Wilson explains this initial step in this segment.

    Rough-In is a term that refers to the initial installation of all the wiring, electrical boxes and other elements needed to circulate power throughout your house. The rough-in is performed by a master electrician and his team of electricians.

    Once the electricians begin the rough-in phase, which will take approximately a week, they pull all the wire through the joists, studs (figure A) and outlet boxes into the switch boxes. Then they tie the electrical panel (figure B) and break up all the circuits per load. You'll see rough-in boxes (figure C) everywhere initially but all the devices will eventually go.

    It's vital that professional electricians perform the rough-in because of the strict codes concerning electrical wiring and systems. Not only is there a national electrical code with safety standards for all home under construction, each city or state also may have its own additional codes that address how electrical system should be installed.

    Constructive Advice: Having licensed electricians on your home building team will assure that your electrical system meets with all necessary codes, which in turn will ensure the highest level of safety for you and your family.

    During the rough-in stage, you electrical team will work from an electrical plan designed by your electrical contractor. This plan will reflect each light switch, light fixture, outlet and other electrical elements that the team will be installing during the rough-in stage.

    advertisement


    PHOTO

    Figure D
    PHOTO

    Figure E
    PHOTO

    Figure F
    PHOTO

    Figure G
    Rough-In Steps

    1. In step one your electrician will mark (figure D) each place inside and outside the house where an electrical element is needed. This will be done in accordance to the home's electrical plan.

    2. In step two the homeowner should go on what's called a "walk-through" with the electrical contractor and builder. A walk-through will be a tour of the house to see where electrical elements have been marked for placement. Any changes you want can be made at this point.

      Some things to look for during an electrical walk-through include:

      • Whether or not the number and type of fixtures to be installed in a room are enough?

      • Light switch placement.

      • If changes are desired, making them now will be simpler and less expensive than making them once the drywall is up?

  • In step three the electrical team will place boxes in each area that a circuit will need to be connected as well as light receptacles (figure E), light fixtures and the switches.

    During this time the electricians will also install your circuit or breaker box, which will bring all the electrical power into the house.

  • In step four the electrical wires are "run" through the house. This will involve drilling through the wood studs in order to pull the wire through the house frame.

    Note: It's important that your electrical team keep the wires neat and organized (figure F). That way, should they need to re-route or re-wire a circuit for some reason, the process will go smoothly and with a lessened chance of error. This is especially true when a different electrician attempts to re-route wires originally run by someone else.

  • The fifth and final step in an electrical rough-in is to cap all circuits (figure G) and mark the wires. This is basically marking which circuit does what so when the electrician come back to make up the panel and put the breakers in, they can label the panel without having to go around and test each outlet.

    Did You Know? -- The red, black and blue wires are referred to as "hot" -- and the green wire is used for "ground" and both the white and gray wires are "neutral" -- true!

    In the next segment you'll find out how your electrical system is finished.


    GUESTS :

    Jeff Winkle
    Director of Community Development
    Cranberry Township
    2525 Rochester Rd.
    Cranberry Township, PA 16066-6499
    Phone: 724-776-4806
    Website: www.twp.cranberry.pa.us

    Dana Bres
    Research Engineer
    US Department of Housing and Urban Development
    451 7th St., SW
    Washington, DC 20910
    Phone: 202-402-5919
    E-mail: dana.b.bres@hud.gov

    Jack Tucker
    Building Wisdom
    We apologize no contact information is available.

    Paul Trudeau
    President
    Hilltop Development
    E-mail: paultrudeau@worldnet.att.net

    Randy Gregg
    Owner
    Gregg Electric
    E-mail: rlcsgregg@aol.com

    Ron Henshaw
    Manager of Code Administration
    Cranberry Township
    E-mail: henshawr@twp.cranberry.pa.us

    Tom Gretz
    Vice President and General Manager
    Arlington Industries
    Phone: 800-233-4717 (ext.3048)

  • ALSO IN THIS EPISODE: