Red Team Activity Journal (1 p.m. - 3 p.m.)
- The "Drills and Frills" Red Team begins adding details to the island. First, copper sheeting is nailed to each end of the island (figure A), before being framed with trim molding that has been cut to the appropriate size. The team attaches the molding using finishing nails (figure B).
- Next, the team measures and cuts molding for use around the countertop.
- The molding is attached, with a "lip" left for the application of tiles.
- The team sands all rough edges and fills the nail holes with putty for a more finished look.
Blue Team Activity Journal (1 p.m. - 3 p.m.)
- While the Red Team is busy adding details, the Blue Team begins measuring and cutting plywood for the top of the island. The sink and countertop measurements are transferred to the plywood, and openings are cut.
- Next, the plywood is measured and cut for the prep counter (figure C) , the desktop, and finally, the eating surface.
- Once the plywood is cut, the team attaches it to the different island surface (figure D).
Want to know more about the products used on Warehouse Warriors? Click here for a complete list of tools, materials and supplies available to our teams.
RESOURCES :
Whirlpool Electric Ranges
Whirlpool Brand
Website: www.whirlpool.com
Delta Faucet Information
To find the nearest Delta Faucet distributor, click here.
Delta Faucet Company
Website: www.deltafaucet.com
Top Choice Lumber
Available at Lowe's Home Improvement Warehouse
DeWalt Industrial Tool Company
http://www.dewalt.com/us/core/
Ornamental Mouldings
Ornamental Mouldings
Archdale, NC 27263
Phone: 336-431-9120
Fax: 336-431-9104
Website: www.ornamental.com
Crossville Ceramics
|