Red Team Activity Journal (1 p.m. - 3 p.m.) - The Red Team scraps the swing design and starts over. The swing idea morphs into two benches.
- With the upright supports still in place, cross braces are added. Two 2 x 6 boards are cut for each bench and attached with screws (figure A).
- Foam and fabric are cut to the correct size to fit the bench.
- While the cushions and cover are being sewn, the rest of the team sets out to add floor joists and composite decking.
- Because of the unusual shape of the deck, the team finds adding support joists troublesome. Their solution? To add joists inside the frame in a diagonal pattern. After adding the floor joists, the team arranges the decking (figure B)
Blue Team Activity Journal (1 p.m. - 3 p.m.) - After the Blue Team adds the 2 x 6 cross supports, composite decking is added (figure C).
- Next, the team measures and cuts balusters that will be attached to the railing.
- Then, 2 x 4 railings are attached to the deck before the balusters are added (figure D).
Want to know more about the products used on Warehouse Warriors? Click here for a complete list of tools, materials and supplies available to our teams.
RESOURCES :
Top Choice Lumber
Available at Lowe's Home Improvement Warehouse
DeWalt Industrial Tool Company
http://www.dewalt.com/us/core/
|