Red Team Activity Journal (11 a.m. - 1 p.m.) - To assemble the supporting frame, the Red Team slides the overhead platform over the vertical supports (figure A) before securing in place.
- The team measures and cuts composite board for the deck on the upper platform before attaching the boards with screws.
- The slide is attached to the playset frame.
- The team then measures and cut lumber for the railings (figure B) .
Blue Team Activity Journal (11 a.m. - 1 p.m.) - After raising the support frame, the Blue Team frames the overhead platform and add floor joists.
- They cut and frame a hole in the overhead platform (figure C) through which they plan to extend a rope ladder. To finish the platform, the team measures and cuts composite board for the deck surface of the overhead platform.
- Taking charge of the team, player Tony Scolieri begins building a climbing wall with an adjustable angle and hand grips.
- The team works together to attach the climbing wall to the playset frame (figure D) before attaching the slide.
Want to know more about the products used on Warehouse Warriors? Click here for a complete list of tools, materials and supplies available to our teams.
RESOURCES :
Top Choice Lumber
Available at Lowe's Home Improvement Warehouse
Swingsets, Inc. (playsets and accessories)
Swingsets, Inc.
Website: www.swingsetsinc.com
|