BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Adhesives & Sealants
Chisels & Planes
Clamps & Vises
Drills
Hammers
Hardware & Accessories
Knives & Blades
Measuring
Metalworking
Power Tools
Sanders & Scrapers
Saws
Screwdrivers
Storing & Organizing
Woodworking
Wrenches & Pliers
Other

Utility Room
Walls & Ceilings
Windows

SPONSOR LINKS

  • Completing the Home Office Transformation
  • From "Home Transformations"
    episode DHTR-111


    In this last installment of a three-part transformation, homeowners Paul and Shelly Kukuk and host Michael Ray Wisely install flooring, an air conditioning unit and add the finishing touches to complete Paul's new home office.
    Photo

    Before: A cluttered backyard storage shed.

    Photo

    After: A chic (and air-conditioned) home office!


    advertisement


    PHOTO

    Figure A
    PHOTO

    Figure B
    PHOTO
    PHOTO

    Figure C
    PHOTO

    Figure D
    Rubberized Linoleum Floor Installation

    Materials:

    1/4 cork material
    Flooring adhesive (mastic)
    Linoleum roller
    Utility knife
    Rubber gloves
    1/8 trowel
    Drywall square
    Measuring tape
    Rubberized recycled linoleum

    1. To clean up the sub floor, use a hammer to knock down any protruding nails.

    2. Next, roll out 15 lb. asphalt saturated felt overlapping each piece 6 inches. The felt creates a vapor barrier and prevents moisture from coming up through the floor (figure A).

    3. Place felt snugly against the walls with a utility knife and use a hammer/ tacker to hold the felt to the subfloor.

    4. Place an underlayment on top of the felt of 3/8" plywood. If using an A/C grade plywood, be sure that the A side, or smooth side is facing upward, while the C side, which typically has knotholes, should be facing downward.

    5. Leave a 1/4-inch gap at the walls to allow for the wood to expand and contract. Also, stagger the seams to create a stronger floor.

    6. To secure the rubber floor, apply mastic with a 16" notched trowel (figure B). Once the floor is applied, use a linoleum floor roller (figure C) to remove any air pockets and to smooth the floor.

    7. Follow the same pattern for the next strips of flooring material being laid down. For the last piece, set the flooring up against the trim to find the correct height. Use a Japanese handsaw to notch the base of the door trim (figure D).

    8. Again use the linoleum floor roller to smooth out the rubberize flooring to the wall. As a finishing touch, install mitered baseboard trim around the base of the walls.

    PHOTO

    Figure E
    PHOTO

    Figure F
    PHOTO

    Figure G
    Threshold Installation

    Materials:

    Oak threshold w/vinyl seal
    Cordless drill
    Phillips #2 hex bit
    Measuring tape

    1. On the doorway entrance, measure and mark a center point. Also measure and mark the center point onto the threshold stock.

    2. Next, trace the outline of the doorjamb onto both ends of the threshold use a hacksaw to notch (figure E). Dry fit the threshold in the doorway.

    3. Measure and mark the length of the door way onto the aluminum sill nosing. This aluminum sill will act as an additional moisture barrier for the wooden sill. Use the hacksaw to cut the aluminum sill nosing to size (figure F).

    4. Test the fit of the aluminum sill nosing in the doorway. To enable the nosing to fit under the doorjamb, cut kerfs at the bottom of the doorjamb stock (figure G). This will allow the aluminum sill nosing to slide in.

    5. To further weatherproof the entrance, run a bead of caulk along the door entrance before the sliding in the aluminum sill nosing.

    6. Once pre-drilling the holes in both the threshold and sill, secure them all in place with screws.

    7. Finally, cut the weather stripping seal to size. Then to get the door to properly fit, score the base with a utility knife and cut below the line with a hand saw. Finally, sand to the score line with a belt sander.

    PHOTO

    Figure H
    PHOTO

    Figure I
    PHOTO

    Figure J
    PHOTO

    Figure K
    Air Conditioner Installation

    Materials:

    Trim stock/casing stock
    Level
    2X4 stock
    AC unit
    Screwdriver
    Nailer
    Framing nails
    Window/portable A/C

    1. Drill pilot holes through the siding to outline the boundaries on the exterior of the shed where to cut. Connect the pilot hole dots on the exterior of the shed and then carefully use a circular saw to cut the opening for the AC unit (figure H).

    2. Next, slide the metal AC unit sleeve through the hole and secure with screws (figure I).

    3. On the exterior of the shed, weatherproof the AC unit by applying a bead of caulking around the seams.

    4. Seal the corners with a self-adhesive rubberized flashing (figure J). Install the rubberized flashing on the inside sill as well.

    5. To finish the exterior, install trim over the rubberized flashing (figure K).

    6. On the interior, trim out the opening with miter-cut trim stock.

    7. Install a 20-amp receptacle for the AC unit. If not comfortable with electrical wiring, contact a licensed electrician.

    8. Slide the AC unit into the sleeve.

    PHOTO

    Figure L
    Good Ergonomics

    After air conditioning is added, track lighting and landscaping complete the home office. Finally, ergonomic expert Wendy Young consults with Paul on working in a home office comfortably (figure L). An ergonomic designed office help keep comfort, reduces injury as well and increases productivity.

    • Seat, arm rest and chair height should be adjusted so feet are flat on floor, lumbar is supported and elbows are slightly above height of arm (to prevent raised shoulders).

    • Desk height should be at comfortable level, with wrists straight and eyes looking straight ahead. Mouse should be close to body.

    • Take a break every hour. Every 20 minutes, look 20 feet away for 20 seconds to minimize eye strain.


    RESOURCES :

    Rubberized Flooring
    Black with Eggshell Flecks
    Amorim Solutions
    26112 110th Street
    Trevor, WI 53179
    Phone: 800-255-2675
    Web site: www.amorimsolutions.com

    Adjustable Sit/Stand Table
    Color: Laminate Gray
    Ergopro
    4914 Bissonet, Suite 101
    Bellaire, TX 77401
    Phone: 800-ERGOPRO
    Web site: Ergopro.com

    Adjustable Chair
    Style: High Back in Black
    Ergo Pro
    4914 Bissonet, Suite 101
    Bellaire, TX 77401
    Phone: 800-ERGOPRO
    Web site: Ergopro.com

  • ALSO IN THIS EPISODE:


  • Gutter Repair
  • Landscaping Basics
  • Flooring
  • UV Air Sanitizer
  • Replacement Windows
  • Planter, Self-Watering
  • Hand-Painted Glasses
  • Choose Washer/Dryer
  • Backsplash Installation
  • Hand-Painted Bowls
  • Prepare for Vacation
  • Maintain Garage Door
  • Disinfect Bathroom
  • Romance Kit
  • Curb Appeal
  • Transport Equipment
  • Installing Undermount
  • Holiday Decorating
  • Family Scrapbook
  • Ice Candle
  • Selecting Doors
  • Spark Plug, Changing
  • Maintain Cabinets
  • Front Door Facelift
  • Change Windowpane