HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Basement Drainage
Bathtubs & Showers
Faucets
Garbage Disposal
Leaks
Pipes & Fittings
Sinks
Toilets
Valves
Water Heaters
Other

Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • PEX Piping
  • Learn how to install a PEX plumbing system.
    From "Ed the Plumber"
    episode DETP-304


    Host Ed Del Grande explains the process of plumbing with PEX piping.

    advertisement


    Materials:

    right angle drill
    set of paddle bits
    PEX cutting tool
    crimp gauge
    nailing plates
    hammer
    soldering kit
    straps and hangers
    PEX pipe
    PEX manifold with ball valves
    various fittings and crimps
    PEX stub outs

    PHOTO

    Figure A
    PHOTO

    Figure B
    Tip: When you're roughing in your lines, use a right angle drill with either an auger bit or paddle bit.

    1. Place the bit up to the stud and slowly start the drill (figure A), allowing it to build up speed as you go through the stud.

    2. Drill through the sill plate and sub-floor for each water line. When drilling through a stud, be sure that each hole is at the same level so the pipe runs parallel to the floor.

    3. Once your holes are drilled, you can start running your water lines. In most cases, the lines will come through the floor. In some cases you'll have to run them across the wall studs. When running the pipes through the studs, first make sure you drill the holes in the center so that when you hang the wall board, the screws or nails shouldn't reach the pipes and damage the pipes.

    Note: Take this extra precaution – Ed recommends using a nail plate (figure B). The nail plate has tacks on both ends of a flat piece of steel. Line them up to cover screws or nails so they don't penetrate the steel to damage pipes.

    4. Pull the lines up through the holes you drilled in the sub-floor (figure C), and then run the other end to the area where the water will be coming into the home. Be sure to leave extra pipe on both ends of the run.

    5. Secure the line to the joists using clamps (figure D). Do your best to separate the hot and cold lines to minimize heat transfer.

    6. Leave a little slack in the line to allow for expansion and contraction. Don't forget to label both ends of the line.
    Photo

    Figure C

    Photo

    Figure D