|
|
| Wet Bar Installation: Completing the Wet Bar |
| Wet Bar Installation: Completing the Wet Bar |
From "Ed the Plumber" episode DETP-213 |
|
|
- Once the dishwasher sink combo is secured to the counter, it's time for the plumbing connections. Start by connecting the flexible stainless steel supply line to the dishwasher 90 and the hot water stop (figure A).
- For your faucet, run the hot and cold lines on the faucet to your hot and cold faucet stops and screw them in.
- Now run your PVC drain lines for the dishwasher and sink (figure B). In most areas you'll need a p-trap for both the dishwasher and sink.
- Finish connecting the sink by running a tailpiece from the basket strainer to your p-trap.
- Turn your hot and cold water lines on and test your system.
Next: Getting Started
|
|
|
|