HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Basement Drainage
Bathtubs & Showers
Faucets
Garbage Disposal
Leaks
Pipes & Fittings
Sinks
Toilets
Valves
Water Heaters
Other

Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • Wet Bar Installation: Installing the Appliances
  • Wet Bar Installation: Installing the Appliances
    From "Ed the Plumber"
    episode DETP-213


    With the rough work done, the next step is to start the finish work or installing the fixtures.
    advertisement


    PHOTO

    Figure A
    PHOTO

    Figure B
    PHOTO

    Figure C
    PHOTO

    Figure D
    PHOTO

    Figure E
    PHOTO

    Figure F

    1. Start by installing the basket strainer to the sink. Use plumber's putty around the strainer (figure A) to prevent leaking. Be generous with the putty to create a waterproof seal, then place the strainer in the sink.

    2. Next, place the rubber gasket and fiber gasket followed by the locking ring around the base of the strainer. Use a strainer wrench to tighten everything up firmly (figure B).

    3. Finally, remove any excess putty.

    4. To install the faucet, use the gasket that comes with the faucet or use plumber's putty to seal the faucet. Slide the supply lines through the hole and mount the faucet to the sink per your manufacturer's instructions (figure C).

    5. When it comes time to actually installing your fixtures Ed recommends starting off the easy ones first such as a refrigerator.

    6. To run the power supply, use a drill with a paddle bit to drill holes through the existing cabinets (figure D). Once the power supply is connected, simply slide the unit into place.

    7. Connect the icemaker water supply line by screwing the braided flexible stainless steel supply to the water connection on the back of the icemaker. Run it to the cold water icemaker stop under the sink area and screw it into place (figure E).

    8. Install your drain and p-trap as per local codes making sure to use PVC glue and primer on all the joints (figure F).

    9. Finally, simply slide the unit into the cabinet area making sure the icemaker drain lines up with the p-trap and plug in the unit.

    Next: Completing the Wet Bar

  • ALSO IN THIS EPISODE: