HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Basement Drainage
Bathtubs & Showers
Faucets
Garbage Disposal
Leaks
Pipes & Fittings
Sinks
Toilets
Valves
Water Heaters
Other

Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • Wet Bar Installation: Water Line Tap-In
  • Wet Bar Installation: Water Line Tap-In
    From "Ed the Plumber"
    episode DETP-213


    Now that the dishwasher is ready to be installed, you'll need to tap into the existing water lines.
    advertisement


    PHOTO

    Figure A
    PHOTO

    Figure B
    PHOTO

    Figure C
    PHOTO

    Figure D
    PHOTO

    Figure E
    PHOTO

    Figure F
    PHOTO

    Figure G

    1. To start the tap-ins, Ed recommends starting with the water lines.

    2. Using a pipe cutter, cut into the hot and cold water lines (figure A). Make sure to have a bucket handy for any water left in the lines.

    3. Next, use your copper 'T' fitting as a template to mark the space where the water line will be cut out (figure B). Using a mini-cutter, remove this section of pipe.

    4. Then, clean and flux the pipe and fittings and install the 'T'. Finish by running your water lines to the bar area using basic soldering techniques (figure C).

      Now, all that is left to do on the water side is to stub the pipes through the wall and you're ready to hook up the fixtures.

    5. To do this, use a 5/8 drill bit to drill a hole at the base of the cold water copper line (figure D). Then, slip on a copper 90 and a short copper piece through the hole. Solder all joints.

    6. Repeat this step for the hot water line, then attach double stops to the end of each line (figure E).

    7. Now, it's time to do the drainage tap in – this whole process is called a rough-in procedure. No two plumbing systems are alike so you may tap in a different way.

    8. To make a template for the tap-in, drill holes on the top and bottom side of the water line. Then, drill two more holes next to the closest stud (figure F).

    9. Use a saw to cut out the area between the holes.

    10. Drill into the water line using a two inch hole saw, then install the saddle 'T'.

    11. Finally, run the drain stubs for the dishwasher and ice maker (figure G).

    Next: Wet Bar: Installing the Appliances

  • ALSO IN THIS EPISODE: