HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Basement Drainage
Bathtubs & Showers
Faucets
Garbage Disposal
Leaks
Pipes & Fittings
Sinks
Toilets
Valves
Water Heaters
Other

Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • Sump Pump: Dressing the Pump
  • Sump Pump: Dressing the Pump
    From "Ed the Plumber"
    episode DETP-108


    After inserting the sump pump in the ground, it's now time to prepare the pump for operation.

    Materials:

    Pipe cutter
    PVC pipe
    Fittings and cement
    Check valve
    Wire ties
    Electric drill and bits
    Sump pump
    advertisement


    PHOTO

    Figure A
    PHOTO

    Figure B

    1. Glue the male adapter to the PVC discharge pipe, then place into the female adapter on the pump (figure A).

    2. Using a 1/4 inch drill, make a hole into the discharge pipe six inches above the pump. This is called a weep hole, which allows water to flow back into the pump when it's turned off to keep it primed.

    3. Attach the pumps electrical cord to the discharge pipe using wire ties.

    4. Install a check valve on the open end of the discharge pipe (figure B).

      Tip: make sure you use a check valve that is made for vertical operation.

    5. Place the pump into the sump.

  • ALSO IN THIS EPISODE: