HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Basement Drainage
Bathtubs & Showers
Faucets
Garbage Disposal
Leaks
Pipes & Fittings
Sinks
Toilets
Valves
Water Heaters
Other

Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • Mixing Valve Installation: Anti-Sweat Valve Installation
  • Mixing Valve Installation: Anti-Sweat Valve Installation
    From "Ed the Plumber"
    episode DETP-105


    The anti-sweat valve is a component that mixes the hot and cold water, keeping the tank from sweating. Ed now explains how to install one onto your water line.

    Materials:

    spare copper pipe and fittings
    safety glasses
    soldering kit
    valve and manufacturers instructions
    Teflon® tape
    advertisement


    PHOTO

    Figure A
    PHOTO

    Figure B
    PHOTO

    Figure C
    Safety Note:: always where safety glasses when cutting or soldering pipe.

    1. Solder the adapter onto a short piece of copper pipe, six inches or so. This will give you something you can attach both to the supply lines and to the anti-sweat valve.

    2. Attach the pipe and fitting assembly to the valve (figure A) by using the compression fitting that comes with the valve.

    3. Add a little Teflon tape onto the ends, insert the pipe and slip the compression fitting nut over the pipe.

    4. Back it up to the appropriate location over the joint, then tighten with a wrench.

    5. Next, connect the valve assembly to the water lines (figure B) by soldering the connections on both the hot and cold water lines at the stop and waste valves.

    6. Connect the 'T' assembly from the hot water line to the mixing valve (figure C). Use a compression fitting or solder, which ever you prefer.

    7. To make the final connections, secure a pipe onto the remaining port on the mixing valve with a compression fitting. Then, install vent couplings on the other end.

    8. Solder the final joints.

    9. Slowly turn on the water at the new stop and waste valves. Start with the cold line, then the hot.

    10. Finally, flush the toilet a few times to get the air out of the lines.

    Next: Replacing Toilet's Fill Valve and Flapper

  • ALSO IN THIS EPISODE: