HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Trellises & Arbors
Decks
Log Cabins
Maintenance
Other

Painting
Plumbing
Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • Move It Outside Pt. 4: Hot Tub and Deck
  • Jay Baker and the Move It Outside crew help with the installation of a hot-tub, deck and water diversion system.
    From "Move It Outside"
    episode DMIO-104


    (Continued from page 4)

    PHOTO

    Installing the underdecking
    Underdecking: Rainwater Diversion System

    Materials:

    water diverters
    1" or 1-1/2" hot-dipped galvanized roofing nails
    --or pan head screws (3 to 4 per rail)
    collection gutter
    joist covers
    joist rails

    Tools:

    power drill
    hammer
    tape measure

    box cutter
    chalk line
    ladder
    gloves
    safety glasses

    advertisement


    PHOTO

    Figure J
    PHOTO

    The underdecking water-diversion system, installed
    Steps:

    • First, measure the length of the deck joists.

    • Then, make a chalk mark from one end of the joist to the other with the pitch going away from the center of the deck.

    • Line the joist rails up against the chalk mark. Attach the joist rail to the joist using 1" or 1-1/2" hot-dipped galvanized roofing nails or pan head screws. Use three to four nails (or screws) per joist rail.

    • Be sure to leave about two inches between each piece of joist rail for drainage. Joist rails can be cut at the end of the joist to maintain the appropriate spacing.

    • When all of the joist rails are nailed in place, slide water diverters between the rails. The purpose of the diverters is to route the water toward the gutters that will be installed on the opposite edge of the deck.

    • Next, measure the length from the water diverters to the edge of the deck and use a box cutter to cut collector panels to the appropriate length (figure J).

    • Slide the collector panels between the joist rails. Make sure that the matte finish side is facing down and the glossy side is facing up.

    • Once the collector panels are in place, cut joist gutters 1/4" shorter than the joist length to allow for expansion.

    • Hold the joist gutter up to the joist; spread the gutter open slightly while pushing up firmly until the gutter snaps into the joist rail and nests tightly against the collector panel. Work your way to the end of the deck.

    • The boundary gutters are the final element of the water diversion system. These gutters collect and dispel the water that flows down the collector panels. Simply nail the boundary gutters below the collector panels at the end of the deck joists.



      1 | 2 | 3 | 4 | 5



    RESOURCES :

    Resources for DIY's Move It Outside workshop

    Stonecraft
    stone products
    www.stonecraftusa.com

    Pizzolongo Plastering and Stucco
    www.pizzolongoplastering.com

    Mason-Lite
    fireplace and fire pit
    www.mason-lite.com

    R.H. Peterson Co.
    fire pit
    www.rhpeterson.com

    UnderDeck
    under-deck water diversion system
    www.underdeck.com

    Viking
    outdoor kitchen
    www.vikingrange.com

    Rinna/RayPak Heaters
    hot tub heater
    www.raypak.com

    The Iron Shop
    spiral staircase
    www.theironshop.com

    Legacy Lanterns
    outdoor lanterns
    www.legacylanterns.com

    O.W. Lee Furniture
    outdoor furniture
    www.owlee.com

    Rocky Creek Stone Works
    stone work installation
    866-416-9024

    Lakeway Mechanical
    plumber/propane installers
    865-993-2981

    First Class Builders
    builder/contractors
    423-585-0768

    Guest experts:
    Eddie Brooks, Lakeway Mechanical
    Mike Harrell and Greg Liveri, First Class Builders
    Mike Pizzalongo, Pizzalongo Plastering and Stucco

  • RELATED PROJECTS:

  • ALSO IN THIS EPISODE: