HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Cabinets, Countertops & Hardware
Faucets & Fixtures
Remodeling

Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • Kitchen Demolition, Pt. 2: Installing Cabinets
  • A kitchen overhaul that includes new hardwood flooring, cabinets and backsplash. Check out more home value-enhancing projects from Sweat Equity.
    From "Sweat Equity"
    episode DSEQ-206


    PHOTO

    Before
    PHOTO

    After
    Having shot their budget on the appliances Chad and Heather need to start saving some serious dough. An easy way to cut out a few thousand dollars is to install the cabinets themselves.

    Below is a summary of the basic steps as seen in this Sweat Equity project, as well as a list of materials and tools used and some installation tips.

    Materials and tools:

    2x4 plywood
    framing nailer
    miter saw
    tape measure
    speed square
    cabinets
    level
    screwdriver (w/drill bit and phillips head)
    or
    power drill
    screws
    shims
    carpenter's pencil
    clamps
    eye protection

    Safety Alert: Always wear eye protection and follow proper safety precautions when working with power tools or pneumatic tools.

    advertisement


    Installing Cabinets

    Tips:

    • On base cabinets, installing your corner cabinet first is the best way to stay level through the rest of the installation.

    • Hang your upper cabinets first so the lower ones won't be in the way during installation.

    • It's a good idea to work in pairs with this project, as cabinets can be heavy.

    • Use a ledger board to hang help hang the upper cabinets and keep them strait.

    • Mark your studs before you get started.

    PHOTO

    Figure A
    PHOTO

    Figure A
    PHOTO

    Figure C
    PHOTO

    Figure D
    Steps:

    • Inventory your cabinets and mark and remove drawers and cabinet doors (figure A). This will make the cabinets easier to work with.

    • Set the cabinets into place and set the faces of adjoining cabinets flush (figure B) using a level and shims.

    • Clamp the cabinets into place and pre-drill a pilot hole though the side (figure C). Sink a screw to secure the cabinets together.

    • Tip: Pre-drilling pilot holes will save the cabinets from splintering or marring.

    • Locate your studs using a stud finder. Secure your cabinets to the wall by drilling screws through the cabinets to the studs (figure D).

    • When all the cabinets are in place attach the doors and install drawers using hardware provided.

  • RELATED PROJECTS:

  • ALSO IN THIS EPISODE: