| Custom Concrete Shower Pan |
| Pour a perfect base for the power-shower. |
From "Bathroom Renovations" episode DBTR-507 |
|
|
A house needs a strong foundation and so does a custom shower. Amy Matthews shows how to pour a custom concrete shower pan that is perfect for tiling.
Materials:
rubber membrane hammer large-head nails 2x6 lumber 2x4 lumber screws screw gun
|  |
safety glasses dust mask torpedo level drill with whip bit concrete mix bucket square masons trowel
|
Custom Concrete Shower Pan
 |

 Figure A
|
|  |

 Figure B
|
|  |

 Figure C
|
|  |

 Figure D
|
|  |

 Figure E
|
|
Flatten the membrane against the bottom of the space, then smooth it up the studs and nail to the studs with large-head nails such as roofing nails. Amy nailed the membrane 6" to 8" up; check local building codes for details on where to nail the membrane and what grade of membrane to use.Fold the membrane over at the corners like making hospital corners with a bedsheet to get a clean edge. Nail to the stud through all layers.With the membrane secured, use a utility knife to carefully cut out the drain hole. Don't cut the hole too large; if there's a grout leak or other water leakage, the membrane needs to be able to funnel the water right down the drain.Put the drain plate in place and tighten the bolts with a socket wrench (figure A). Cover the top of the drain with painter's tape to protect it and screw it into the drain, leaving a 1-1/4" gap between the drain and the drain plate. Use a level to mark a line all the way around the rubber membrane to show the final height of the concrete. For this project, the concrete came up 2-1/2" at the wall, sloping down to 1-1/4" at the drain. Check local building codes for specific requirements.To build a curb at the shower door, measure and cut a piece of 2x6 lumber to fit across the outside of the shower door studs. Screw the piece to the studs at floor level (figure B).Safety Alert: Wear safety glasses and use caution if using a power saw to cut the lumber for this project. Flatten the rubber membrane against the 2x6 and trim off the excess with a utility knife.Measure and cut a piece of 2x4 lumber to fit across the inside of the shower door studs. Position it inside the door studs so that the top of the 2x4 is level with the top of the 2x6 and screw into place (figure C).Wearing safety glasses and a dust mask, mix concrete according to the manufacturer's instructions until it's the consistency of a milkshake (figure D). Use a drill with a whip bit to mix the concrete quickly and evenly.Safety Alert: Always wear safety glasses and a dust mask when mixing concrete or similar substances. Use caution when working with power drills or other power tools. Pour concrete onto the rubber membrane and spread it out with a mason's trowel. Spread the concrete evenly, working it up to the marked line and sloping it down to the drain. Gently bat the surface of the wet concrete with the flat side of the trowel; this will bring moisture to the surface and help the concrete dry to a smoother finish (figure E). Don't forget to fill the curb form with concrete as well.Let the concrete dry completely before tiling.
|