GARDENING Index
Diseases & Weeds
Flowers
Fruits & Vegetables
General Information
Container Gardening
Insects & Pests
Kids Gardening
Lawns & Landscaping
Landscaping, Arranging & Mulching
Raised Beds
Structures, Walls & Walkways
Other

Plants & Foliage
Public Gardens
Seasons & Zones
Services & Associations
Shrubs & Trees
Soil & Water
Structures & Ornaments
Tools
Water Gardening
Wildlife

SPONSOR LINKS

  • Building the Foundation
  • Building the Foundation
    From "Grounds for Improvement"
    episode DGFI-211


    The Sextons' playhouse is in the process of being leveled and secured on sloping ground. Treated 4x4 lumber and cinderblocks are being used to raise and temporarily support the house while a more permanent timber foundation is built.

    advertisement


    After leveling front to back and back to front, and with cinderblocks still supporting the house, the foundation is dug deep enough to support three rows of 6x 6x12 treated timbers (figure A) (figure B) (figure C).
    Photo

    Figure A

    Photo

    Figure B

    Photo

    Figure C


    The first course is secured into the ground with rebar, after first drilling a hole in each end of the timber with an auger bit (figure D). The second course is then set with a slight overhang, ensuring secure ends, before being secured to the first timber with a timber spike (figure E).
    Photo

    Figure D

    Photo

    Figure E


    The final course of the foundation is put in place after using the 4x4 to raise the house up slightly. After the third course has been secured with rebar and timber spikes, the house is finally level (figure F). The weight of the structure, due to the metal studs, is enough to set it firmly on the support wall; lighter structures might need to be secured with metal brackets.

    Painting begins while the house is elevated; this makes it easier to access the lower sections. A cheerful shade of yellow paint called Sunshower is rolled on; then Jackie goes back over the wood-grain siding with a brush to enhance the look of the grain (figure G).

    With the house foundation in place, a sandbox is next on the list of things to do. There is a 4' framing support extension off the back wall; the sand box will extend 4' past the corner of the house and wrap around the house slightly to encompass the change in elevation between the corner of the house and the ground (figure H).
    Photo

    Figure F

    Photo

    Figure G

    Photo

    Figure H



    RESOURCES :

    Black and Decker tools
    Website: www.blackanddecker.com
    Black & Decker, Inc. (Corporate)
    Website: www.bdk.com/main_bd.htm

    Porter-Cable Tools
    Porter-Cable Corporation
    Website: www.deltaportercable.com

    Irwin Industrial Tool Company
    Website: www.irwin.com

    Ames True Temper Tools
    Ames-True Temper
    Website: www.ames-truetemper.com

    American Society of Landscape Architects

    Delta Tools
    Deltak Power Tools
    Website: www.deltamachinery.com

    Plants provided by Skinner Nurseries Inc.
    Skinner Nurseries Inc.
    Website: www.skinnernurseries.com

    Fountain provided by Al's Garden Art
    Al's Garden Art
    Website: www.alsgardenart.com

    Sealants
    OSI Sealants, Inc.
    Website: www.osisealants.com

    Lumber
    Western Red Cedar Lumber Association
    Website: www.realcedar.org

  • ALSO IN THIS EPISODE: