Sixteen-inch holes are dug for the lettered posts, they are then set in place, checked for plumb and backfilled with dirt (figure B).As a final touch a 2" layer of mulch is distributed up the hillside to help hold moisture and provide a backdrop for the stones and plants (figure C).