HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Brick
Concrete
Gravel
Paved
Stone

Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • Front Step Revamp: Setting the Bluestone Treads
  • From "Rock Solid"
    episode DROC-113


    After the cobbles have set up overnight, it’s time to set the bluestone platform.

    advertisement


    PHOTO

    Before demolition
    PHOTO

    The front step after Derek and Dean's revamp
    Materials:

    Safety glasses
    Chisel
    Hammer
    Heavy-duty crowbar
    Heavy sledge hammer
    Spade shovel
    Mixing hoe with holes
    Wheelbarrow
    Trowel
    Pencil
    6' Level
    Rubber mallet
    Grinder with diamond blade
    Measuring tape
    Jointers
    Paint brush
    String
    Rebar
    Mason sand
    Type S cement
    Cobblestones (new or used)
    Bluestone treads
    Multiple bluestone

    PHOTO

    Figure A
    PHOTO

    Figure B
    PHOTO

    Figure C
    PHOTO

    Figure D

    • Begin by setting the treads framing the platform first -- starting with the tread running parallel to the door threshold. Prop the treads up on top of two cobbles or bricks; this will make it easier to get your fingers underneath the stone. Mark the center point of the cobblestone row (figure A) -- this should be the same place marked earlier in the mortar. Then, mark the center of the first tread -- you will match up these two center points when setting the first tread. Make sure with your measuring tape that the area running from underneath the threshold to the top of the cobbles, when set with treads, will pitch slightly forward.

    • Trowel 1/2 inch of mortar on top of the cobbles and keep the mortar back about a ½ inch from their face -- this will keep the mortar from oozing out to stain the face of the stone. Don’t skimp on mortar in the corners! Run your six foot level across the mortar before setting the tread to make sure it’s level and smooth (figure B).

    • Set the bluestone tread on top of the mortared cobbles and align the two marked center points. Level the tread front to back and side to side and then make sure that the tread is exactly 4 feet off the house on both ends. Adjustments can be made by with a rubber mallet. Once you have your first tread where you want it, secure the front of the stone with a few shims placed in the mortar underneath. After the stone has set up, the shims will be removed, but in the meantime they’ll ensure that the tread doesn’t move while setting the other stones (figure C).

    • Set the two side tread pieces (figure D) -- and make sure that the finished edge is facing out. Repeat the same process for setting the tread: begin with 1/2 inch of mortar, set the stone, check for level, and adjust with a rubber mallet.

    With the treads set, it’s time to set the remainder of the bluestone platform: the multiple bluestone pieces!

  • ALSO IN THIS EPISODE: