DIY Network

All Projects

TV Projects

What Do You Want To Work On?

What Activity Do You Want To Do?

0

Available Projects

Get Results

Blog Cabin

Blog Cabin 2013: Final Stages of Framing

The home gets dried in, rough-ins are installed and windows and doors are set in place.

More in Blog Cabin

+ Enlarge Photo
Shrink Photo
Blog Cabin Final Framing
Featured Products in This Gallery

The vertical post for the ridge beam is evident. This built-up post is stacked through the first floor and down to the foundation wall. The roof rafters of the south gabled porch are cantilevered out over the exterior wall to increase the ceiling in the family room and lower the total load imparted on the lower porch roof to support the upper gable.

Advertisement

Loading...

Please forgive us, this gallery is really popular.

We sent a note to our support staff about the glitch you just experienced. Please click the button below to reload your content.