DIY Network

Blog Cabin

Blog Cabin 2013: Final Stages of Framing

The home gets dried in, rough-ins are installed and windows and doors are set in place.

More in Blog Cabin

+ Enlarge Photo
Shrink Photo
Blog Cabin Final Framing
Featured Products in This Gallery

The vertical post for the ridge beam is evident. This built-up post is stacked through the first floor and down to the foundation wall. The roof rafters of the south gabled porch are cantilevered out over the exterior wall to increase the ceiling in the family room and lower the total load imparted on the lower porch roof to support the upper gable.

Advertisement

Loading...

Please forgive us, this gallery is really popular.

We sent a note to our support staff about the glitch you just experienced. Please click the button below to reload your content.

Blog Cabin 2014

Blog Cabin 2014 Floor Plan

Tour the home via this Flash-based floor plan.

Don't have Flash? Explore spaces via beautiful sideshows.

Visit Photo Gallery Central

Blog Cabin Specials and Hosts

  • Chris Grundy

    Blog Cabin 2014 Host

    Tool expert Chris Grundy highlights the transformation from beginning to end.

  • Alison Victoria

    Kitchen Crashers

    Interior designer Alison Victoria surprises shoppers and creates fabulous new kitchens.

  • Matt Muenster

    Bath Crashers

    Licensed contractor Matt Muenster shares amazing bathroom design tips.